Garden · GA-022

Compost sieve staging stand

Support a collection tub and the separately built sifter at a low working height with room to remove the tub.

Editorial construction draft. Original digital diagrams; no physical build or load certification. Read dimensions, fit and use limits before making changes. US customary dimensions control; metric values are references.

Before marking and cutting

Use limits

Materials and cuts

PartQtySize to cutMaterial
P01 Legs424 × 3 1/2 × 1 1/2 in
609.6 × 88.9 × 38.1 mm
2 × 4 in board sound untreated wood
P02 Upper front and rear rails226 × 3 1/2 × 1 1/2 in
660.4 × 88.9 × 38.1 mm
2 × 4 in board sound untreated wood
P03 Upper end rails218 × 3 1/2 × 1 1/2 in
457.2 × 88.9 × 38.1 mm
2 × 4 in board sound untreated wood
P04 Tub shelf slats323 × 3 1/2 × 3/4 in
584.2 × 88.9 × 19.05 mm
1 × 4 in board sound untreated cedar or other durable untreated wood
P05 Shelf cleats218 × 1 1/2 × 1 1/2 in
457.2 × 38.1 × 38.1 mm
2 × 2 in board sound untreated wood

Hardware and consumables

Tools

Assembly

GA-022 dimensioned assembly
  1. Plan the compost sieve staging stand for this result: Support a collection tub and the separately built sifter at a low working height with room to remove the tub. Confirm the design reference before cutting: Top rail surface 24 in (609.6 mm) above ground; shelf surface 8-3/4 in. In the drawings x runs left to right, y runs front to rear and z runs upward.
  2. Verify the required stock before laying out these parts: 1 × 4 in board: actual 0.75 × 3.5 in (19.05 × 88.9 mm); 2 × 2 in board: actual 1.5 × 1.5 in (38.1 × 38.1 mm); 2 × 4 in board: actual 1.5 × 3.5 in (38.1 × 88.9 mm). Reject split or twisted wood and unknown salvage; thinner stock requires recalculating the joints, not simply using the listed lengths.
  3. Cut and label the finished parts: 4 Legs 24 × 3.5 × 1.5 in (609.6 × 88.9 × 38.1 mm), mark P01; 2 Upper front and rear rails 26 × 3.5 × 1.5 in (660.4 × 88.9 × 38.1 mm), mark P02; 2 Upper end rails 18 × 3.5 × 1.5 in (457.2 × 88.9 × 38.1 mm), mark P03; 3 Tub shelf slats 23 × 3.5 × 0.75 in (584.2 × 88.9 × 19.05 mm), mark P04; 2 Shelf cleats 18 × 1.5 × 1.5 in (457.2 × 38.1 × 38.1 mm), mark P05. Keep saw kerf outside each finished line. Rip only where the finished width is narrower than the actual stock; use a suitable guide and target ±1/16 in (1.6 mm) for ordinary cuts. Dowel triples mean length × diameter × diameter, not square dowel stock.
  4. Stand the four legs with outside envelope 26 × 18 in. Their 3-1/2 in faces run front to rear.
  5. Attach the 26 in rails outside front and rear leg faces with their tops flush at z = 24 in. Use four 3 in screws at each rail/post crossing, staggered away from the end grain.
  6. Attach the 18 in end rails outside the left and right leg faces, also top-flush. Offset their screw locations vertically so the corner screws cannot collide.
GA-022 dimensioned parts or elevation
  1. Clamp the frame square and add four angle braces beneath the top at the manufacturer-compatible fixing points. These prevent racking; they do not create a rated work platform.
  2. Attach the two 18 in shelf cleats inside the left and right leg lines with upper faces at z = 8 in. Use four 3 in screws into each leg crossing.
  3. Lay the three 23 in shelf slats between the left and right leg lines, x = 1-1/2 to 24-1/2 in, on the cleats at y = 0, 7-1/4 and 14-1/2 in. Fasten each slat with two 1-1/2 in screws at each cleat crossing. The legs remain clear of the slat ends.
  4. Dry-fit the collection tub on the shelf and the sifter on the upper rails. Select a tub opening that catches all screened material and permits vertical removal.
  5. Test empty on level firm ground. Then stage one small batch and confirm there is no rocking or tub interference; never climb, sit or use the stand as a lifting bench.
  6. Complete the acceptance checks below before putting the assembly into service. Record any changed stock thickness, fastener or equipment fit on the project sheet. The published geometry has not been physically built or load-tested.

Checks

Operation

Cleaning and maintenance

Primary context