Garden · GA-050

Fixed-height mulch spreading screed

Draw loose mulch to an example 1-1/2 in layer between two skids resting on firm reference surfaces.

Editorial construction draft. Original digital diagrams; no physical build or load certification. Read dimensions, fit and use limits before making changes. US customary dimensions control; metric values are references.

Before marking and cutting

Use limits

Materials and cuts

PartQtySize to cutMaterial
P01 Leveling blade136 × 2 1/2 × 3/4 in
914.4 × 63.5 × 19.05 mm
1 × 3 in board sound untreated cedar or other durable untreated wood
P02 Skids210 × 3 1/2 × 1 1/2 in
254 × 88.9 × 38.1 mm
2 × 4 in board sound untreated wood
P03 Hand grips28 × 1 1/2 × 3/4 in
203.2 × 38.1 × 19.05 mm
1 × 2 in board sound untreated cedar or other durable untreated wood; no unknown salvage

Hardware and consumables

Tools

Assembly

GA-050 dimensioned assembly
  1. Plan the fixed-height mulch spreading screed for this result: Draw loose mulch to an example 1-1/2 in layer between two skids resting on firm reference surfaces. Confirm the design reference before cutting: Blade lower edge 1-1/2 in (38.1 mm) above both skid bottoms. In the drawings x runs left to right, y runs front to rear and z runs upward.
  2. Verify the required stock before laying out these parts: 1 × 2 in board: actual 0.75 × 1.5 in (19.05 × 38.1 mm); 1 × 3 in board: actual 0.75 × 2.5 in (19.05 × 63.5 mm); 2 × 4 in board: actual 1.5 × 3.5 in (38.1 × 88.9 mm). Reject split or twisted wood and unknown salvage; thinner stock requires recalculating the joints, not simply using the listed lengths.
  3. Cut and label the finished parts: 1 Leveling blade 36 × 2.5 × 0.75 in (914.4 × 63.5 × 19.05 mm), mark P01; 2 Skids 10 × 3.5 × 1.5 in (254 × 88.9 × 38.1 mm), mark P02; 2 Hand grips 8 × 1.5 × 0.75 in (203.2 × 38.1 × 19.05 mm), mark P03. Keep saw kerf outside each finished line. Rip only where the finished width is narrower than the actual stock; use a suitable guide and target ±1/16 in (1.6 mm) for ordinary cuts. Dowel triples mean length × diameter × diameter, not square dowel stock.
  4. Place the 10 in skids flat and parallel at x = 0–3-1/2 and 32-1/2–36 in. Their upper faces are 1-1/2 in above the reference surface.
  5. Stand the 36 in blade across the skids at y = 4-5/8–5-3/8 in. Its lower edge rests on the skid tops, setting the example layer height.
  6. Clamp the blade square to both skids. Mark two underside screw centers per skid at x = 3/4 and 2-3/4 in from the outside end, y = 5 in.
GA-050 dimensioned parts or elevation
  1. Drill upward through each skid into the blade lower edge, using a guide to stay centered in its 3/4 in thickness. Drive four 3 in screws without splitting the blade.
  2. Attach the two 8 in grips to the blade rear face at x = 6–14 and 22–30 in, z = 2–3-1/2 in. Use four 1-1/4 in screws per grip from the front.
  3. Round skid leading ends and blade corners. Check that the blade lower edge remains parallel to the skid bottoms.
  4. Place the skids on firm level reference strips beside a small loose-mulch trial and pull with both hands. Do not force through stones, roots or established stems.
  5. Measure the finished layer and compare with the crop/site recommendation. The 1-1/2 in construction example is not a universal mulch depth, and loose mulch will settle.
  6. Complete the acceptance checks below before putting the assembly into service. Record any changed stock thickness, fastener or equipment fit on the project sheet. The published geometry has not been physically built or load-tested.

Checks

Operation

Cleaning and maintenance

Primary context

These sources inform the context and do not endorse the original construction design.