Garden · GA-008

Small-seed tapping chute

Guide counted small dry seeds from a broad loading area to a narrow delivery tip.

Editorial construction draft. Original digital diagrams; no physical build or load certification. Read dimensions, fit and use limits before making changes. US customary dimensions control; metric values are references.

Before marking and cutting

Use limits

Materials and cuts

PartQtySize to cutMaterial
P01 Chute floor114 × 3 × 1/2 in
355.6 × 76.2 × 12.7 mm
measured 1/2 in plywood exterior-bond plywood for protected non-food-contact fixtures; substitute thickness only by recalculating joints
P02 Chute sides214 × 1 1/2 × 3/4 in
355.6 × 38.1 × 19.05 mm
1 × 2 in board sound untreated cedar or other durable untreated wood; no unknown salvage
P03 Rear stop11 1/2 × 1 1/2 × 3/4 in
38.1 × 38.1 × 19.05 mm
1 × 2 in board sound untreated cedar or other durable untreated wood; no unknown salvage

Hardware and consumables

Tools

Assembly

GA-008 dimensioned assembly
  1. Plan the small-seed tapping chute for this result: Guide counted small dry seeds from a broad loading area to a narrow delivery tip. Confirm the design reference before cutting: Inside channel 1-1/2 in (38.1 mm), with no protruding hardware. In the drawings x runs left to right, y runs front to rear and z runs upward.
  2. Verify the required stock before laying out these parts: 1 × 2 in board: actual 0.75 × 1.5 in (19.05 × 38.1 mm); measured 1/2 in plywood: measured thickness 0.5 in. Reject split or twisted wood and unknown salvage; thinner stock requires recalculating the joints, not simply using the listed lengths.
  3. Cut and label the finished parts: 1 Chute floor 14 × 3 × 0.5 in (355.6 × 76.2 × 12.7 mm), mark P01; 2 Chute sides 14 × 1.5 × 0.75 in (355.6 × 38.1 × 19.05 mm), mark P02; 1 Rear stop 1.5 × 1.5 × 0.75 in (38.1 × 38.1 × 19.05 mm), mark P03. Keep saw kerf outside each finished line. Rip only where the finished width is narrower than the actual stock; use a suitable guide and target ±1/16 in (1.6 mm) for ordinary cuts. Dowel triples mean length × diameter × diameter, not square dowel stock.
  4. Mark the floor opening between y = 3/4 and 2-1/4 in. Keep this 1-1/2 in channel constant; it is a seed chute, not a precision seeder.
  5. Clamp the side rails upright and align both delivery ends with x = 14 in. Predrill four holes through the floor per rail.
  6. Fasten the rails from below with 1 in screws, placed at x = 1, 5, 9 and 13 in. Confirm no tips enter the channel.
GA-008 dimensioned parts or elevation
  1. Fit the 1-1/2 in rear stop between the rails at x = 0. Fasten through the base with two screws, avoiding the side fasteners.
  2. At the delivery end round the floor corners to a 1/4 in radius. Do not narrow the outlet by freehand guessing; seeds must leave through the full channel.
  3. Sand the channel smooth, vacuum dust and install a clean paper liner. Do not apply an unverified chemical coating to the seed path.
  4. Count a small seed lot onto the rear half of the liner. Hold the outlet just above the marked sowing line and tip the chute slightly.
  5. Tap the outside lightly with a fingertip and stop after each seed falls. Practice over a contrasting empty tray before using valuable seed.
  6. Complete the acceptance checks below before putting the assembly into service. Record any changed stock thickness, fastener or equipment fit on the project sheet. The published geometry has not been physically built or load-tested.

Checks

Operation

Cleaning and maintenance

Primary context

These sources inform the context and do not endorse the original construction design.