Garden · GA-014

Pea-twine harp panel

Provide many light vertical climbing strings on a removable flat perimeter frame.

Editorial construction draft. Original digital diagrams; no physical build or load certification. Read dimensions, fit and use limits before making changes. US customary dimensions control; metric values are references.

Before marking and cutting

Use limits

Materials and cuts

PartQtySize to cutMaterial
P01 Uprights260 × 1 1/2 × 1 1/2 in
1524 × 38.1 × 38.1 mm
2 × 2 in board sound untreated wood
P02 Top and bottom rails236 × 2 1/2 × 3/4 in
914.4 × 63.5 × 19.05 mm
1 × 3 in board sound untreated cedar or other durable untreated wood

Hardware and consumables

Tools

Assembly

GA-014 dimensioned assembly
  1. Plan the pea-twine harp panel for this result: Provide many light vertical climbing strings on a removable flat perimeter frame. Confirm the design reference before cutting: Ten climbing lines at 3 in pitch; no sharp hole edges. In the drawings x runs left to right, y runs front to rear and z runs upward.
  2. Verify the required stock before laying out these parts: 1 × 3 in board: actual 0.75 × 2.5 in (19.05 × 63.5 mm); 2 × 2 in board: actual 1.5 × 1.5 in (38.1 × 38.1 mm). Reject split or twisted wood and unknown salvage; thinner stock requires recalculating the joints, not simply using the listed lengths.
  3. Cut and label the finished parts: 2 Uprights 60 × 1.5 × 1.5 in (1524 × 38.1 × 38.1 mm), mark P01; 2 Top and bottom rails 36 × 2.5 × 0.75 in (914.4 × 63.5 × 19.05 mm), mark P02. Keep saw kerf outside each finished line. Rip only where the finished width is narrower than the actual stock; use a suitable guide and target ±1/16 in (1.6 mm) for ordinary cuts. Dowel triples mean length × diameter × diameter, not square dowel stock.
  4. Set uprights at 36 in outside width. Mark the lower rail bottom at z = 6 in and upper rail bottom at z = 57-1/2 in.
  5. Clamp rails to the front of the posts. Use two 2-1/2 in screws per end, at z offsets 3/4 and 1-3/4 in within each rail.
  6. Check both frame diagonals and adjust before tightening. Keep post faces parallel so strings lie in one plane.
GA-014 dimensioned parts or elevation
  1. Mark ten string holes along both rails at x = 4-1/2, 7-1/2, 10-1/2, 13-1/2, 16-1/2, 19-1/2, 22-1/2, 25-1/2, 28-1/2 and 31-1/2 in.
  2. Drill 3/16 in holes centered in the 2-1/2 in rail height and sand their mouths. This is a 3 in string pitch, not a crop-spacing instruction.
  3. Lace one continuous twine length up and down the panel. Tie off at the first and last hole; keep tension light enough not to bow the rails.
  4. Tie the frame to two independent site-appropriate posts at both upper and lower rails. Confirm it cannot rock into a path.
  5. Guide young tendrils toward the strings by hand without strangling stems. Cut and remove vines and twine at the end of the crop.
  6. Complete the acceptance checks below before putting the assembly into service. Record any changed stock thickness, fastener or equipment fit on the project sheet. The published geometry has not been physically built or load-tested.

Checks

Operation

Cleaning and maintenance