Use limits

Materials and cuts

PartQtySize to cutMaterial
P01 Long rails218 × 2 1/2 × 3/4 in
457.2 × 63.5 × 19.05 mm
1 × 3 in board sound untreated cedar or other durable untreated wood
P02 End rails210 1/2 × 2 1/2 × 3/4 in
266.7 × 63.5 × 19.05 mm
1 × 3 in board sound untreated cedar or other durable untreated wood
P03 Mesh floor118 × 12 × 1/25 in
457.2 × 304.8 × 1.02 mm
galvanized hardware cloth 1/4 in grid, about 19 gauge; all cut edges trapped under battens; soil contact only
P04 Lower battens218 × 1 1/2 × 3/4 in
457.2 × 38.1 × 19.05 mm
1 × 2 in board sound untreated cedar or other durable untreated wood; no unknown salvage
P05 Drain clearance runners212 × 1 1/2 × 1 1/2 in
304.8 × 38.1 × 38.1 mm
2 × 2 in board sound untreated wood

Hardware and consumables

Tools

Assembly

GA-055 dimensioned assembly
  1. Plan the ground-level downspout debris catcher for this result: Catch large roof leaves in a removable screened tray below an existing ground-level discharge, with a clear bypass around the tray. Confirm the design reference before cutting: No exposed mesh edges; tray can be lifted without touching the discharge. In the drawings x runs left to right, y runs front to rear and z runs upward.
  2. Verify the required stock before laying out these parts: 1 × 2 in board: actual 0.75 × 1.5 in (19.05 × 38.1 mm); 1 × 3 in board: actual 0.75 × 2.5 in (19.05 × 63.5 mm); galvanized hardware cloth: 1/4 in grid, about 19 gauge; all cut edges trapped under battens; soil contact only; 2 × 2 in board: actual 1.5 × 1.5 in (38.1 × 38.1 mm). Reject split or twisted wood and unknown salvage; thinner stock requires recalculating the joints, not simply using the listed lengths.
  3. Cut and label the finished parts: 2 Long rails 18 × 2.5 × 0.75 in (457.2 × 63.5 × 19.05 mm), mark P01; 2 End rails 10.5 × 2.5 × 0.75 in (266.7 × 63.5 × 19.05 mm), mark P02; 1 Mesh floor 18 × 12 × 0.04 in (457.2 × 304.8 × 1.02 mm), mark P03; 2 Lower battens 18 × 1.5 × 0.75 in (457.2 × 38.1 × 19.05 mm), mark P04; 2 Drain clearance runners 12 × 1.5 × 1.5 in (304.8 × 38.1 × 38.1 mm), mark P05. Keep saw kerf outside each finished line. Rip only where the finished width is narrower than the actual stock; use a suitable guide and target ±1/16 in (1.6 mm) for ordinary cuts. Dowel triples mean length × diameter × diameter, not square dowel stock.
  4. Assemble the 18 × 12 in open frame with the 10-1/2 in end rails between the long rails. Fasten two screws per corner.
  5. Clamp the frame square before final tightening. The clear aperture is 16-1/2 × 10-1/2 in.
GA-055 dimensioned parts or elevation
  1. Lay the 18 × 12 in mesh beneath it and trap front/rear edges with the two battens, six screws per batten.
  2. Crimp smooth edge channels over the two remaining mesh edges. File burrs and verify no wire can contact a hand during lifting.
  3. Choose an existing ground-level downspout outlet whose drainage route is already suitable. Do not modify roof gutters, create a blockage in a pipe or direct runoff toward foundations.
  4. Fit the two 12 in runners beneath the battens at x = 0–1-1/2 and 16-1/2–18 in. From beneath each runner drill/drive one #8 × 2 in screw at y = 3/4 and 11-1/4 in into the batten above, four total; tips stop inside the batten. Place on the existing suitable splash area with all runoff bypass paths clear.
  5. Run a small low-flow test while watching the entire bypass. Remove the catcher immediately if water backs up or leaves carry flow toward a structure.
  6. Lift and empty after each event. This coarse catcher intercepts leaves only; it does not remove pathogens, chemicals or sediment fine enough to pass the mesh.
  7. Complete the acceptance checks below before putting the assembly into service. Record any changed stock thickness, fastener or equipment fit on the project sheet. The published geometry has not been physically built or load-tested.